>>Speaker: WPSAPS Unit 4A. Worker Hours
or Budget Pathway?

00:00:32.833 --> 00:00:36.733
So today's objectives we're
going to create prevention

00:00:36.733 --> 00:00:40.799
planning scenarios, generate,
review and edit prevention

00:00:40.800 --> 00:00:41.633
action sets.

00:00:46.600 --> 00:00:51.200
So before we begin, we need
to go over some terms so that we

00:00:51.200 --> 00:00:55.966
are all on the same page and for
consistency across the board for

00:00:55.966 --> 00:00:59.199
when we're talking about
prevention actions.

00:00:59.700 --> 00:01:04.400
So general actions, also known
as the GA, it consists of four

00:01:04.400 --> 00:01:08.633
categories, the education,
enforcement, engineering and

00:01:08.633 --> 00:01:09.766
administration.

00:01:11.100 --> 00:01:18.400
The general actions can potentially affect the entire Management Unit or the MU.

00:01:19.000 --> 00:01:24.833
They are not bound by a
Prevention Unit, the PU, and can

00:01:24.833 --> 00:01:28.199
be found in Appendix G.

00:01:28.200 --> 00:01:31.600
Specific Actions or the SA consists of

00:01:31.600 --> 00:01:37.666
seven categories: Patrol,
signing, law enforcement,

00:01:37.666 --> 00:01:44.232
hazard reduction, personal contacts,
inspections, administration, and

00:01:44.233 --> 00:01:46.099
community actions.

00:01:46.533 --> 00:01:54.366
The specific actions take place
in specifically identified

00:01:54.366 --> 00:02:00.799
prevention units and do not
affect the overall management

00:02:00.800 --> 00:02:05.600
unit, but supports the overall
prevention plan.

00:02:06.200 --> 00:02:08.800
They can also be found in
Appendix G.

00:02:09.233 --> 00:02:14.366
So again, general actions affect
the entire management unit.

00:02:14.633 --> 00:02:20.533
Specific actions are then
prevention actions that affect a

00:02:20.533 --> 00:02:23.533
certain area within your plan.

00:02:24.933 --> 00:02:30.566
Community actions can be
attached to general actions or

00:02:30.566 --> 00:02:36.999
specific actions, and these are
actions that are identified for

00:02:37.000 --> 00:02:40.500
communities for a specific
reason.

00:02:41.800 --> 00:02:45.133
They do not affect the entire
management unit or the

00:02:45.133 --> 00:02:47.633
prevention unit, but supports
the plan.

00:02:48.500 --> 00:02:56.500
Again, hours, prevention actions
that affect a specific community.

00:02:56.500 --> 00:02:59.033
And then Action Plan.

00:02:59.800 --> 00:03:05.833
The action plan is a combination
of general actions, specific actions,

00:03:05.833 --> 00:03:08.799
and community actions
that supports the overall

00:03:08.800 --> 00:03:10.000
prevention plan.

00:03:11.100 --> 00:03:14.966
They identify what are the
target starts, what are you

00:03:14.966 --> 00:03:16.432
going to do about it?

00:03:16.433 --> 00:03:21.899
Those are the actions to affect
the target starts.

00:03:21.900 --> 00:03:27.633
With what budget, funds, hours, personnel?
Where are you going to implement

00:03:27.633 --> 00:03:28.833
these actions?

00:03:29.433 --> 00:03:32.733
When will you potentially
implement them?

00:03:34.133 --> 00:03:39.333
And again, these are endless
actions, combinations that

00:03:39.333 --> 00:03:42.966
can be applied to any prevention
plan.

00:03:47.233 --> 00:03:51.233
So continuing on with prevention
terms, we have Scenarios.

00:03:52.266 --> 00:03:57.232
So scenarios are- takes
everything that has been put

00:03:57.233 --> 00:04:02.333
into WPSAPS so far, your mapping, your data, your assessments

00:04:02.333 --> 00:04:07.099
combined with the science research data and the

00:04:07.100 --> 00:04:14.200
best practices to formulate an
overall plan or scenario and the

00:04:14.200 --> 00:04:21.000
actions with the various
combinations, the general

00:04:21.000 --> 00:04:25.833
action, specific action, and
community actions that makes a

00:04:25.833 --> 00:04:30.799
scenario and you can have many
different scenarios pending the

00:04:30.800 --> 00:04:31.933
combination.

00:04:38.133 --> 00:04:41.433
WPSAPS can assist in
scenario development.

00:04:42.333 --> 00:04:47.433
So what is a scenario? And a
scenario again is an option of

00:04:47.433 --> 00:04:52.966
how you can utilize everything
that you put into the program so far,

00:04:52.966 --> 00:04:58.399
and helps you decide what
prevention actions to implement.

00:04:59.400 --> 00:05:04.000
Multiple scenarios can be
developed to compare and

00:05:04.000 --> 00:05:05.600
contrast outcomes.

00:05:06.066 --> 00:05:10.532
The results, what fires are
being prevented, what is the

00:05:10.533 --> 00:05:11.299
reduction.

00:05:12.800 --> 00:05:17.600
Ultimately, you would love to
select a scenario that best

00:05:17.600 --> 00:05:21.500
meets the need of the overall
management unit.

00:05:22.500 --> 00:05:25.533
Results of a scenario and plans.

00:05:26.666 --> 00:05:30.232
They identify prevention
actions, the development of a

00:05:30.233 --> 00:05:33.599
plan, indicating who, when,
where, what, and how to

00:05:33.600 --> 00:05:34.800
implement the plan.

00:05:35.733 --> 00:05:36.466
Reporting.

00:05:36.700 --> 00:05:39.733
That's the best thing about
WPSAPS, is we have a

00:05:39.733 --> 00:05:43.466
reporting option to monitor your
progress on the implementation

00:05:43.466 --> 00:05:44.166
of the plan.

00:05:45.700 --> 00:05:50.533
But most importantly, WPSAPS is
a guide of program of work.

00:05:51.433 --> 00:06:03.533
It allows you the flexibility to
change as your circumstances

00:06:03.533 --> 00:06:06.266
change throughout the management
unit pending on the year,

00:06:06.266 --> 00:06:10.532
pending on all the different
factors that influence what we

00:06:10.533 --> 00:06:10.833
do.

00:06:11.266 --> 00:06:13.632
So this is a plan that's
developed at the beginning of

00:06:13.633 --> 00:06:19.166
the year that guides us through
the 12 months.

00:06:20.200 --> 00:06:25.733
But knowing that we are flexible
with all the different items

00:06:25.733 --> 00:06:32.366
that get thrown at us, fires,
closures, etcetera.

00:06:32.366 --> 00:06:37.466
And WPSAPS is best for conducting risk
assessments and planning

00:06:37.466 --> 00:06:40.899
workloads for the management
unit where they will be

00:06:40.900 --> 00:06:41.966
implemented.

00:06:44.600 --> 00:06:53.000
Meaning if you make a plan, make
it specific to an area.

00:06:54.200 --> 00:07:00.700
For example, if a plan is
created just for region 1, it

00:07:00.700 --> 00:07:06.266
gets watered down way too
quickly and then it doesn't have

00:07:06.266 --> 00:07:14.299
the greatest effect, an outcome
if I'm just targeting versus

00:07:14.300 --> 00:07:18.566
just targeting a specific
forest, a specific unit where

00:07:18.566 --> 00:07:20.866
the work will be done.

00:07:24.500 --> 00:07:26.200
So let's get started.

00:07:26.200 --> 00:07:30.333
Now that we have all of the
terms, we can begin.

00:07:30.866 --> 00:07:35.666
So creating a scenario, after
you do a risk assessment, you'll

00:07:35.666 --> 00:07:38.466
be you'll come to create a
scenario.

00:07:39.100 --> 00:07:42.333
The first thing you need to do
is select a pathway.

00:07:43.200 --> 00:07:48.533
The pathway will either be
worker hours or based on budget.

00:07:50.066 --> 00:07:54.699
You choose budget when you know
the overall budget available to

00:07:54.700 --> 00:07:58.900
spend on prevention, employees,
supplies, vehicle,

00:07:58.900 --> 00:08:00.133
support budget, etcetera.

00:08:01.866 --> 00:08:05.232
Worker hours is when you know
the portion of the employees

00:08:05.233 --> 00:08:14.233
time available to implement prevention actions within the management unit

00:08:14.233 --> 00:08:18.599
so you select the correct pathway that you

00:08:18.600 --> 00:08:21.400
wish to proceed with.

00:08:23.700 --> 00:08:27.433
So regardless of the pathway you
need to know two things.

00:08:27.900 --> 00:08:30.000
You need to know your annual
worker salary.

00:08:30.466 --> 00:08:36.366
Even if an employee is 13/13 18/8, a collateral duty, this

00:08:36.366 --> 00:08:39.866
number is for a full time
employee.

00:08:39.866 --> 00:08:41.766
It goes into the equation in the
algorithm.

00:08:42.700 --> 00:08:47.166
It's not gross income, but the
true cost to government, the

00:08:47.166 --> 00:08:49.899
salary, the benefits, the
insurance.

00:08:52.933 --> 00:08:58.266
So by default the program
automatically puts in 80,000.

00:08:59.000 --> 00:09:00.200
That's just by default.

00:09:00.533 --> 00:09:04.766
You can change this to fit your
scenario.

00:09:05.933 --> 00:09:08.866
You can find your agency salary
table.

00:09:10.133 --> 00:09:14.866
This one of course WPSAPS is
based off the 2020 OPM salary

00:09:14.866 --> 00:09:22.132
table which is equivalent to a GS
Nine Step 3 and then some easy

00:09:22.133 --> 00:09:23.033
math there.

00:09:23.033 --> 00:09:28.299
GS Seven Step 4 is roughly
$78,000. So make sure you use the

00:09:28.300 --> 00:09:33.300
updated amounts and know what
your agency and what your

00:09:33.300 --> 00:09:37.033
prevention person truly cost
your agency.

00:09:38.333 --> 00:09:40.933
The second thing you need to
know is administrative hours.

00:09:41.533 --> 00:09:46.899
Administrative hours is
training, annual leave, sick

00:09:46.900 --> 00:09:53.333
leave, holidays, projected off
unit assignments because we only

00:09:53.333 --> 00:09:59.766
want to know how many hours are
available to do prevention work

00:09:59.766 --> 00:10:02.466
within the management unit.

00:10:03.200 --> 00:10:09.066
So if an individual takes one or
two assignments, subtract those

00:10:09.066 --> 00:10:12.966
hours from base hours that
you'll be gone.

00:10:13.300 --> 00:10:19.233
So if you take one assignment
off your home unit a year

00:10:19.233 --> 00:10:25.399
roughly, I mean that is 80 hours
because we're only doing base

00:10:25.400 --> 00:10:32.100
time and then any kind of
meetings again stressing base

00:10:32.100 --> 00:10:33.233
hours only.

00:10:34.133 --> 00:10:40.666
So a general rule of thumb is if
you have a full time employee

00:10:40.666 --> 00:10:47.099
doing prevention work, 20% of
that time is admin for so about

00:10:47.100 --> 00:10:48.133
416 hours.

00:10:48.633 --> 00:10:57.266
So full time employee has 2,080
hours, subtract the 416 that

00:10:57.266 --> 00:11:02.132
leaves 1,664 hours to do
prevention work base hours.

00:11:05.800 --> 00:11:10.500
And a lot of you are thinking,
OK, well I do a lot of overtime

00:11:10.500 --> 00:11:12.500
during throughout the year.

00:11:13.500 --> 00:11:17.233
That's OK because in WPSAPS
we have that reporting tool.

00:11:17.233 --> 00:11:20.733
So you actually get to report
what you did, what actions you

00:11:20.733 --> 00:11:21.466
actually did.

00:11:21.600 --> 00:11:24.300
So we'll go over that in in
future units here.

00:11:28.266 --> 00:11:31.999
So I kept that simple ratio up
there just for a visual because

00:11:32.000 --> 00:11:35.466
we'll be referencing this 80/20
quite a bit throughout the

00:11:35.466 --> 00:11:36.099
PowerPoint.

00:11:36.700 --> 00:11:40.833
So once you choose a path, annual
salary, and your admin time is

00:11:40.833 --> 00:11:45.866
entered, you need to enter what
hours are dedicated to

00:11:45.866 --> 00:11:50.432
prevention. Worker hours pathway,
it's called worker hours.

00:11:51.066 --> 00:11:55.766
And then for the budget pathway,
it's called labor total and

00:11:55.766 --> 00:12:00.399
labor total will be the same as
the annual's worker salary.

00:12:07.000 --> 00:12:11.466
OK, We're going to go over a
couple different scenarios

00:12:11.466 --> 00:12:20.932
pending on full time employee
collateral duty and either 13/13 and 18/8.

00:12:20.933 --> 00:12:26.166
So there are different ways to
fill out this this information

00:12:26.166 --> 00:12:29.266
pending on the availability of
hours.

00:12:31.533 --> 00:12:34.966
So the first one we're going to
do is we're going to use the

00:12:34.966 --> 00:12:35.799
budget pathway.

00:12:37.100 --> 00:12:40.966
So we got a first of all select
the pathway, enter your annual

00:12:40.966 --> 00:12:44.866
worker salary and this is going
to be for a full time employee.

00:12:45.466 --> 00:12:48.666
And we're going to use that 20%
saying 416.

00:12:49.500 --> 00:12:55.966
And then just for simplicity,
I'm going to keep the 80,000 as

00:12:55.966 --> 00:12:57.532
the individual.

00:12:57.533 --> 00:13:02.066
So labor total is going to equal
the worker salary.

00:13:03.500 --> 00:13:05.366
And then I'm going to put in a
support budget.

00:13:06.400 --> 00:13:15.400
The support budget is any
supplies your vehicle, all

00:13:15.400 --> 00:13:18.300
the other stuff that you need to run a successful

00:13:18.300 --> 00:13:20.266
prevention program.

00:13:21.400 --> 00:13:24.266
So checking for accuracy.

00:13:24.666 --> 00:13:30.166
So down at the bottom you see a
budget total of $85,000.

00:13:30.500 --> 00:13:35.333
That is the salary plus the
support budget because that's

00:13:35.333 --> 00:13:38.233
what the program is going to
cost.

00:13:38.800 --> 00:13:43.666
And so 80,000 / 80,000 = 1 full
time employee.

00:13:44.400 --> 00:13:50.866
One full time
employee has 1,664 hours to

00:13:50.866 --> 00:13:58.766
implement this plan and then the
prevention hour total is in this

00:13:58.766 --> 00:14:07.399
case since it is full time 1,664.
Only to do prevention actions

00:14:07.400 --> 00:14:10.033
for that one full time employee.

00:14:26.300 --> 00:14:31.700
So what if now we have a
employee who's not full time?

00:14:33.733 --> 00:14:39.033
So you will still need the
annual worker salary in either

00:14:39.033 --> 00:14:43.933
pathway that you choose, either
13/13 or 18/8.

00:14:46.800 --> 00:14:51.100
You need the salary and the
administrative hours.

00:14:51.933 --> 00:14:56.466
So up in the table there I put
some quick calculations on what

00:14:56.466 --> 00:15:00.399
a 13/13 or half time
employee, how many hours that

00:15:00.400 --> 00:15:03.333
would be and then also for the
18/8.

00:15:04.933 --> 00:15:13.399
And then as we work through this
this the sheet things change.

00:15:14.666 --> 00:15:20.966
So in this case here we chose to
do worker hours, annual worker

00:15:20.966 --> 00:15:26.399
salary of $80,000 and the
administrative hours is about

00:15:26.400 --> 00:15:26.766
100.

00:15:27.133 --> 00:15:33.766
So again you want to get this to
as close as you can what sick

00:15:33.766 --> 00:15:36.932
leave, what annual leave and
adjusted accordingly.

00:15:37.833 --> 00:15:39.866
And so in this scenario we chose
100.

00:15:41.333 --> 00:15:45.566
So now it is 1/2 time employee.

00:15:46.266 --> 00:15:55.299
So they only have 1,040 hours
available to do prevention work

00:15:55.300 --> 00:15:58.400
and hopefully again up in the
administrative hours you

00:15:58.400 --> 00:16:01.833
subtracted any kind of off unit
assignment.

00:16:02.666 --> 00:16:04.799
But this is what hours are
available.

00:16:04.800 --> 00:16:09.766
It is 1,040, they are 1/2 time
employee and then a support

00:16:09.766 --> 00:16:11.032
budget of 5000.

00:16:11.666 --> 00:16:13.199
So checking for accuracy.

00:16:13.900 --> 00:16:20.233
So for the budget you have
$45,000 because it is 1/2 time

00:16:20.233 --> 00:16:21.199
employee.

00:16:22.500 --> 00:16:29.166
Half of the 80,000 is 40,000 and
then plus the 5000 for the

00:16:29.166 --> 00:16:34.266
support budget and then you have
1040 / 2080.

00:16:34.800 --> 00:16:40.000
That's the hours equals 1/2 time
employee for half time employee.

00:16:40.933 --> 00:16:49.199
So one full time employee is
1980 because that's the 2080 -,

00:16:49.200 --> 00:16:49.733
100.

00:16:50.066 --> 00:16:52.599
So if that was a full time
employee, that's how many hours

00:16:52.600 --> 00:16:53.533
they'd have available.

00:16:54.266 --> 00:16:57.366
However, we only have the 1,040.

00:16:57.700 --> 00:17:07.566
So 1040 - 100 is 940 hours
available to do prevention work

00:17:07.566 --> 00:17:09.632
for that halftime employee.

00:17:10.300 --> 00:17:14.066
So in that circle there on the
bottom, they have that full time

00:17:14.066 --> 00:17:14.899
employee line.

00:17:14.900 --> 00:17:19.200
Just to clear it up, just so you
know the difference in the

00:17:19.200 --> 00:17:19.600
hours.

00:17:20.133 --> 00:17:27.133
So prevention, our total is 940
to do prevention work within

00:17:27.133 --> 00:17:33.799
that unit and then that either
pathway that should be the

00:17:33.800 --> 00:17:34.700
outcome.

00:17:39.433 --> 00:17:41.533
So what if it's just a
collateral duty?

00:17:42.400 --> 00:17:48.100
What if an FMO or an engine
captain has the prevention as a

00:17:48.100 --> 00:17:49.600
collateral duty?

00:17:51.933 --> 00:17:58.599
Use the workers pathway, worker
hours pathway for this scenario.

00:18:01.066 --> 00:18:06.532
So calculate what admin time
that will be taken from the

00:18:06.533 --> 00:18:11.266
dedicated prevention hours as a
collateral duty.

00:18:11.266 --> 00:18:15.899
Not all the admin time is coming
from the dedicated prevention

00:18:15.900 --> 00:18:16.333
hours.

00:18:18.066 --> 00:18:25.066
So again, admin time is
typically 20% of the total time.

00:18:26.700 --> 00:18:31.300
20% = 416 hours of the 2080.

00:18:32.900 --> 00:18:38.533
But we only have a certain
amount of hours.

00:18:39.300 --> 00:18:43.733
Collateral duties typically are
20%.

00:18:44.133 --> 00:18:47.333
So what is 20% of a full time
416?

00:18:48.133 --> 00:18:58.666
So now you take 20% of the 416,
which is 83 hours of admin time.

00:19:00.033 --> 00:19:06.499
So again collateral duties
typically is only 20% of an

00:19:06.500 --> 00:19:13.833
individual's time, 416 take 20%
of that to get admin time 83

00:19:13.833 --> 00:19:14.533
hours.

00:19:17.400 --> 00:19:22.133
So I have an annuals worker
salary of 80,000, administrative

00:19:22.133 --> 00:19:27.133
hours of 83 and this individual
only has 416 hours to dedicated

00:19:27.133 --> 00:19:30.633
to prevention with a support
budget of 5000.

00:19:32.066 --> 00:19:39.799
So the budget total checking for
accuracy we have 21,000 and

00:19:39.800 --> 00:19:47.266
dollars we have 416 hours
divided by 2080 which is .2 full

00:19:47.266 --> 00:19:49.032
time employee.

00:19:49.300 --> 00:19:50.333
So that is correct.

00:19:50.333 --> 00:19:54.399
That is 20% of the individual of
of a full time employee.

00:19:56.100 --> 00:20:02.333
And so prevention hours is going
to be 333 hours to do prevention

00:20:02.333 --> 00:20:06.733
and that is the 416 -, 83 hours
of admin time.

00:20:07.333 --> 00:20:12.266
To solely do prevention actions
for that one full time employee

00:20:12.266 --> 00:20:14.266
if it's a collateral duty.

00:20:21.733 --> 00:20:28.166
So once you have the correct
pathway and the correct hours

00:20:28.166 --> 00:20:32.499
you would continue on to the
next step.

00:20:35.033 --> 00:20:41.199
You then would have this pop up
box of hours distribution for

00:20:41.200 --> 00:20:42.966
action categories.

00:20:43.633 --> 00:20:46.633
So we have general actions and
we have specific actions.

00:20:47.100 --> 00:20:49.000
So how to divide your time?

00:20:49.800 --> 00:20:51.066
You only have so many hours.

00:20:51.066 --> 00:20:52.866
How do you want to split that
time.

00:20:52.866 --> 00:21:00.166
By default, again, WPSAPS has a 3070 as
the space holders.

00:21:01.000 --> 00:21:03.666
Those are just space holders,
kind of like that 80,000 from

00:21:03.666 --> 00:21:04.532
the previous screen.

00:21:05.666 --> 00:21:12.466
But through beta testing and
lots of different scenarios and

00:21:12.466 --> 00:21:19.732
using different percentages, the
best result from the testers is

00:21:19.733 --> 00:21:23.866
having a 50/50 split percentage
wise.

00:21:23.866 --> 00:21:28.999
So 50% of the hours will do
general actions, specific

00:21:29.000 --> 00:21:33.633
actions also 50% being 840 hours
in each action.

00:21:34.400 --> 00:21:37.133
However you can play with these.

00:21:37.133 --> 00:21:40.399
This was just the option of the
best overall outcome through the

00:21:40.400 --> 00:21:40.800
testing.

00:21:41.266 --> 00:21:44.732
Now let's say you are a
prevention specialist and you

00:21:44.733 --> 00:21:48.533
don't get out into the field to
implement as many specific

00:21:48.533 --> 00:21:51.466
actions for prevention units
such as patrols.

00:21:52.466 --> 00:21:56.199
Then yes you the percent
percentages could change.

00:21:57.266 --> 00:22:00.932
But for our demo we will be
using the 50/50.

00:22:09.033 --> 00:22:14.099
So once you accept that and you
save that then your scenario is

00:22:14.100 --> 00:22:14.866
populated.

00:22:16.533 --> 00:22:22.966
So here we are, we have a demo
and we have the worker hours of

00:22:22.966 --> 00:22:28.366
1,680, $80,000 labor,
$10,000 support budget and

00:22:28.366 --> 00:22:30.899
$90,000 the total budget.

00:22:31.666 --> 00:22:37.432
So this screenshot came from
some the numbers that I put in

00:22:37.433 --> 00:22:39.733
and it is now populated.

00:22:40.233 --> 00:22:47.199
We have 0 fires prevented and
we'll talk about that in future

00:22:47.200 --> 00:22:49.533
lessons here shortly.

00:22:50.066 --> 00:22:54.366
And we have our general action
action sets and we have specific

00:22:54.366 --> 00:22:55.666
action sets.

00:22:55.666 --> 00:22:58.799
Those are each set to 0 because
we have not done anything yet.

00:22:59.100 --> 00:23:02.200
We have a load properties and
delete.

00:23:07.066 --> 00:23:13.266
So in future presentation we'll
go over this in detail.

00:23:17.900 --> 00:23:24.133
So now the question might come
up of you went over to the

00:23:24.133 --> 00:23:28.899
scenarios of a full time person,
a part time person and a

00:23:28.900 --> 00:23:30.400
collateral duty.

00:23:30.866 --> 00:23:33.799
What if there are multiple
employees?

00:23:33.800 --> 00:23:40.366
What are some options to do
to calculate all that time and

00:23:40.366 --> 00:23:42.932
the hours and the budget?

00:23:44.533 --> 00:23:49.466
So currently there is no way
with WPSAPS to assign an

00:23:49.466 --> 00:23:52.899
employee to a specific
prevention unit.

00:23:53.233 --> 00:23:59.066
So if you're doing a forest
plan, I cannot say person A is

00:23:59.066 --> 00:24:04.566
going to the north unit and
person B to the South unit.

00:24:05.400 --> 00:24:10.400
There's no way to differentiate
individuals to prevention units.

00:24:10.400 --> 00:24:13.533
It's for the entire management
unit.

00:24:14.666 --> 00:24:18.532
So here's the example again.

00:24:18.533 --> 00:24:22.299
So on the Lolo National Forest,
there are 5 prevention techs, 1

00:24:22.300 --> 00:24:25.766
per each range of district, and
one prevention specialist.

00:24:27.333 --> 00:24:32.566
If I create one plan, if the MU
is the entire Lolo National

00:24:32.566 --> 00:24:37.599
Forest, WPSAPS computes it
that all the tech's actions,

00:24:37.600 --> 00:24:44.900
regardless of where they are,
will affect the entire Lolo

00:24:44.900 --> 00:24:48.066
National Forest and not just
their assigned ranger district,

00:24:48.066 --> 00:24:49.532
which isn't true.

00:24:49.733 --> 00:24:55.966
So person A up North is not
going to affect the South in a

00:24:55.966 --> 00:24:58.166
in a prevention unit.

00:24:59.500 --> 00:25:06.033
So for our scenario, each Lolo
tech district will be the

00:25:06.033 --> 00:25:08.933
management unit and then the
prevention techs will then

00:25:08.933 --> 00:25:11.566
divide their district into
prevention units.

00:25:11.700 --> 00:25:16.633
This is just one way of doing
WPSAPS and then the Lolo

00:25:16.633 --> 00:25:21.633
National Forest Specialist,
their whole management unit will

00:25:21.633 --> 00:25:26.366
be the forest and then each
district is a prevention unit

00:25:26.366 --> 00:25:28.566
for those specific actions.

00:25:29.200 --> 00:25:34.200
But we'd have to come together
and then make a table and see

00:25:34.200 --> 00:25:39.333
all the different actions that
we are implementing across the

00:25:39.333 --> 00:25:39.899
forest.

00:25:40.200 --> 00:25:41.933
So this is just one way to do
it.

00:25:44.933 --> 00:25:50.066
So just breaking down the multi
employee scenarios there.

00:25:50.300 --> 00:25:53.933
There again, there's no defined
method for developing prevention

00:25:53.933 --> 00:25:55.866
plans with more than one
employee.

00:25:56.533 --> 00:25:57.966
But we do.

00:25:58.100 --> 00:26:03.500
We have identified 4 different
methods to develop a plan for

00:26:03.500 --> 00:26:06.666
this scenario of multiple
employee.

00:26:07.866 --> 00:26:12.932
One is to create a spreadsheet,
develop an overall scenario that

00:26:12.933 --> 00:26:17.499
covers all the positions, then
manually sorting out those

00:26:17.500 --> 00:26:22.100
workloads or who's doing what
actions using a spreadsheet.

00:26:22.933 --> 00:26:25.233
This works best in that that
budget pathway.

00:26:25.900 --> 00:26:31.300
So you would take person A plus
person B to get total hours and

00:26:31.300 --> 00:26:35.733
then you would take their
funding, total money

00:26:35.733 --> 00:26:36.566
available.

00:26:37.233 --> 00:26:44.999
And then in a spreadsheet, once
you decide further on what

00:26:45.000 --> 00:26:52.233
everybody's doing, you would say
person A is doing XYZ, person B

00:26:52.233 --> 00:26:55.166
will do CDE.

00:26:57.700 --> 00:26:59.533
And then we have the average
method.

00:27:00.000 --> 00:27:04.266
Develop an overall scenario that
covers all the positions.

00:27:04.666 --> 00:27:09.299
Use yearly action plans than to
create individual work plans for

00:27:09.300 --> 00:27:10.300
each employee.

00:27:11.933 --> 00:27:16.466
This is recommended as it is
simple and requires less

00:27:16.466 --> 00:27:21.399
calculations and again works
best with the budget pathway.

00:27:21.866 --> 00:27:27.066
So in the next unit, Unit 5 will
go over yearly action plans, but

00:27:27.066 --> 00:27:32.066
you develop an overall scenario
and then you would have person

00:27:32.066 --> 00:27:36.966
A's yearly action plan, person
B's yearly action plan, person

00:27:36.966 --> 00:27:42.166
C's yearly action plan, and then
you can see what each individual

00:27:42.166 --> 00:27:44.366
is doing and record as such.

00:27:46.700 --> 00:27:50.333
So it's really using the
averages and then making

00:27:50.333 --> 00:27:52.466
multiple yearly action plans.

00:27:52.466 --> 00:28:00.399
Again, action plans will be
covered in Unit 5 and then the

00:28:00.400 --> 00:28:07.633
third option, an overall
scenario with the individual

00:28:07.633 --> 00:28:08.966
scenarios.

00:28:09.600 --> 00:28:14.233
Develop an overall scenario that
covers all the positions using

00:28:14.233 --> 00:28:18.299
the overall scenario to
establish suppression, savings,

00:28:18.300 --> 00:28:20.033
effectiveness, and cost.

00:28:20.633 --> 00:28:25.999
This method may be a combination
of worker hours and budget

00:28:26.000 --> 00:28:26.533
paths.

00:28:28.000 --> 00:28:31.500
And then lastly option 4 develop
individual scenarios and

00:28:31.500 --> 00:28:32.266
spreadsheets.

00:28:33.400 --> 00:28:37.000
Develop individual scenarios for
each employee, then add the

00:28:37.000 --> 00:28:39.600
workloads up manually using the
spreadsheets.

00:28:40.466 --> 00:28:45.366
This method most likely will
overestimate the effectiveness

00:28:45.366 --> 00:28:50.432
and should be crossed checked
against an overall scenario for

00:28:50.433 --> 00:28:55.333
differences in suppression, cost
savings and effectiveness.

00:28:56.066 --> 00:28:59.366
The overall scenario should be
expected to produce the most

00:28:59.366 --> 00:29:02.332
realistic estimate of fires
reduced and the benefits.

00:29:03.533 --> 00:29:09.066
This method can be used with
either worker hours or budget

00:29:09.066 --> 00:29:14.499
pathway and the two tables that
and the math checking for

00:29:14.500 --> 00:29:20.466
accuracy are just examples
of how to do each of the four

00:29:20.466 --> 00:29:21.199
options.

00:29:22.233 --> 00:29:23.833
And again, these are just
options.

00:29:24.733 --> 00:29:28.499
You can definitely experiment
with different trial and trial

00:29:28.500 --> 00:29:31.666
and errors and cross
referencing's for those multi

00:29:31.666 --> 00:29:32.766
employee scenario.